Dock Electrical Upgrades

Docks & Terminals

Location

Nameplate Capacity

Keystone provided engineering design support services and developed a Phase II quality total installed cost estimate for the Dock Electrical Upgrade Project. The project goal included increasing reliability and improving maintenance at the refinery. Keystone's scope of work included installing new 5KV transformers for the dock and a new Main-Tie-Main (M-T-M) breaker system for the electrical feed to the refinery cooling water pumps.

Additionally, the scope involved the installation of two 5KV switch racks, the replacement of seven 480v motors on cooling water pumps with new 4160v motors, and the installation of new raceway and cable to interconnect all new equipment.