Carbon Black Facility Installations

Downstream

Location

Nameplate Capacity

The project consisted of installing of a new Reactor, Air Preheater, Feedstock Preheater, Waste Heat Boiler, Cooling Water System, and Vent Scrubber at a carbon black facility. Process piping for reactor was tied into to the existing blower and bag filter systems. Reactor utility piping was interfaced with existing facility utility system piping systems at various locations throughout facility. Multi-level Structures were implemented with for support of associated utility and process piping requirements along with operations and maintenance access platforms to equipment and instrumentation. Project also included interface with pipe stress analysis and incorporation of stress requirements to Structural design. Keystone project execution team included Civil, Structural, Mechanical, Electrical, and Instrumentation engineering discipline support.

To learn more about our Renewable Energy department,
please click to visit our Renewables site.