Central Tank Battery

Downstream

Location

Permian Basin

Nameplate Capacity

The project consists of a production facility to handle bulk product from 12 Wells.  The facility included Test Separators, Heater Treaters, Oil Storage Tanks, Produced Water Storage Tanks, Skim Oil System, Produced Water Transfer Pumps, Oil LACT Unit, Vapor Recovery Unit, Gas Dehydration, Gas Compression, and Vent/Relief System. The facility was powered from the local utility.  The facility was controlled by PLC.  Keystone is providing multi-discipline engineering and design services for the facility and pipeline interconnects.

To learn more about our Renewable Energy department,
please click to visit our Renewables site.