Location
Eagle Ford
Nameplate Capacity
70 MMscfd gas, 20,000 BOPD, 10,000 BWPD
Greenfield design of a central facility with capacities of 70 MMscfd gas, 20,000 BOPD and 10,000 BWPD. Facility included a gas train with Inlet Scrubbers, gas compression, gas cooling, H2S treating, filter coalescers, dehydration, and metering. Liquids train included LP Separators, Oil Treaters, Vapor Recovery, Oil and Water Storage, LACT skids, Oil Pipeline Pumps and Truck Loading. Utilities includes Instrument Air, Fuel Gas, and High/Low Pressure Flare Systems.