Nameplate Capacity
7 MMSCFD total gas, 1,800 BPD oil, 5,000 BPD water
Project to convert a drilling, separation, and compression facility to a full-production facility whereby oil and as can be directly exported to market from the platform, eliminating any reliance on other platforms. Bulk production will increase to 7 MMSCFD total gas, 1,800 BPD oil, and 5,000 BPD water. Upgrades include the addition of a line heater, heater treater, replacement of pipeline pumps, booster pumps, sump tank, and chemical tanks/skids (demulsifier and water treatment chemicals). Existing MCC was retrofitted for the pipeline pump replacement. Keystone provided detailed engineering and design services of the facility upgrades.