Location
Nameplate Capacity
Provided FEED selection and layout of vertical track gangway, detailed design of support structure, and interface with gangway vendor and fabricator/installer throughout the project. Leveraged laser scan and 3D model to interface with existing hose tower access system and minimize footprint. Located obstructions to facilitate prep/demo work, minimizing dock downtime. Provided access platforms as required. Performed structural analysis and design of new operator building support structure and existing deck for new loads.