Gangway Additions

Docks & Terminals

Location

Nameplate Capacity

Provided FEED selection and layout of vertical track gangway, detailed design of support structure, and interface with gangway vendor and fabricator/installer throughout the project.  Leveraged laser scan and 3D model to interface with existing hose tower access system and minimize footprint.  Located obstructions to facilitate prep/demo work, minimizing dock downtime.  Provided access platforms as required.  Performed structural analysis and design of new operator building support structure and existing deck for new loads.

To learn more about our Renewable Energy department,
please click to visit our Renewables site.