Location
Nameplate Capacity
Keystone provided engineering and detailed design for the support structure and lattice tower for the meteorological tower for a 268 MW offshore wind farm in Maryland. The intricate steel lattice tower is approximately 330 feet (100.6 meters) in height and is supported with a braced caisson foundation. Keystone’s scope of work included conceptual and detailed design of the substructure and tower, electrical subsystems design, mechanical subsystems design, project management services, on-site fabrication support, bidding documentation prep, and installation strategy support.