Mont Belvieu To Beaumont Pipeline

Midstream

Location

Nameplate Capacity

Keystone provided multi-disciplined engineering services to design and install a new liquids pipeline to loop an existing ethane pipeline between Mont Belvieu to Beaumont, TX.  Specifically, the pipeline scope or work will include the following: 16 miles of 30” trunkline, 10 HDD’s,2 pigging sites. In addition, all associated foundations, supports, piping, and I&E interconnect. Pipeline scope includes hydraulic calculations and material selection, API 1102 crossing calculations, HDD design, and interface with surveying for plat and alignment sheet development.

Keystone provided multi-disciplined engineering services to design and install a new liquids pipeline from an existing terminal in Beaumont to a plant in Port Arthur.   Specifically, the pipeline scope or work will include the following: 12 miles of 16” pipeline, and 8 miles of 12”pipeline, 15 HDD’s, 3 pigging sites. In addition, all associated foundations, supports, piping and I&E interconnect. Pipeline scope includes hydraulic calculations and material selection, API 1102 crossing calculations, HDD design, and interface with surveying for plat and alignment sheet development.

To learn more about our Renewable Energy department,
please click to visit our Renewables site.