Steam Header Replacement

Downstream

Location

Nameplate Capacity

Keystone provided a FEED study and detailed engineering for replacing the 900lb steam header on two existing boilers at an alumina refinery. The project scope of work included detailed design piping and civil construction packages. Additionally, the construction packages included tie point drawings, demo drawings, and piping plans, elevations, and details.

To learn more about our Renewable Energy department,
please click to visit our Renewables site.