The project consisted of the installation of three temporary steam boilers, one deaerator with BFW pumps, a blowdown vessel, CEMS units, demineralized water processing trailer and storage, wastewater storage, and transfer pumps. Approximately 10,000 linear feet of pipe was installed. Medium voltage, low voltage, and control power systems were installed. The systems were controlled via local PLCs on each piece of equipment and terminated at a central processing unit. A battery limit access platform was included in the scope. Keystone provided engineering and design services.