Terminal Modernization

Docks & Terminals

Location

Nameplate Capacity

As part of a significant upgrade effort at the bulk terminal facility, Keystone provided engineering, design, automation programming, and on-site support. Keystone scope included the following: electrical load studies, specifications for electrical power system equipment, design of electrical and control systems for four new stacker gantry units and existing Krupp trailer-tripper unit, design of two complete substations, and design of electrical and control systems for reconfiguration of two existing yards, including cable tray, power systems, lighting, and grounding.

Additionally, the scope of work included electrical one-line diagrams for demolition and the new facility power distribution network, construction cost estimate and Primavera schedule, control philosophy and sequence of operations for the entire facility, and programming for all new PLCs and revise programming for all existing to remain PLCs.

To learn more about our Renewable Energy department,
please click to visit our Renewables site.